Flat pack container house is the star product of China's temporary construction. As a new modular house in recent years。
Flat pack container house is the star product of China's temporary construction. As a new modular house in recent years, it is made of steel frame material, which is not only convenient to build and move, but also has superior fireproof and heat preservation performance and long life, etc. It does not produce any construction waste and does not change the geological environment of the site, so it is gradually favored by the majority of construction companies and home buyers.
External dimensions: 5990*2440*2900 | Internal size: 5830*2275*2515 | |
Profile: 2.3mm top frame | top frame | 2.3mm galvanized forming beam, galvanized content 80g/㎡, 180mm wide and 5568mm long |
2.3mm galvanized forming beam, galvanized content 80g/㎡, 180 wide and 2133mm long | ||
Galvanized C90*30*20 cross brace, galvanized content 80g/㎡ | ||
20*20mm galvanized square tube, galvanized content 80g/㎡ | ||
W water retaining plate, galvanized content 80g/㎡ | ||
Lower beam angle steel flashing, 5630mm | ||
Angle steel flashing of lower beam, 2195mm | ||
Profile: 2.3mm bottom frame | Bottom frame | 2.3mm galvanized forming beam, galvanized content 80g/㎡, 160 wide and 5568mm long |
2.3mm galvanized forming beam, galvanized content 80g/㎡, 160 wide and 2133mm long | ||
Galvanized "Ji" steel cross brace, galvanized content 80g/㎡ | ||
Integrated sink with flashing base, L5630mm | ||
Integrated sink with flashing base, L2195mm | ||
Profile: 2.3mm column | column | 2.3mm galvanized column, galvanized content 80g/㎡ 210 wide, 150 wide 2536mm |
Connector 2.0mm, galvanized content 80g/㎡ | ||
L-shaped column reinforcement | ||
Special hanger for container house | hanging head | 8mm corner fittings, galvanized content 80g/㎡ 200mm high 150mm wide 210mm long |
8mm corner fittings, galvanized content 80g/㎡ 160mm high 150mm wide 210mm long | ||
Lock capping plate Single tile capping | Single tile roofing | 0.4mm color steel single tile, 360-degree joint, special waterproof method |
Auxiliary material Moisture-proof | Moisture-proof | Moisture-proof film, PE resin film 1.0mm |
Auxiliary material 100 glass wool | 100 glass wool | 100mm glass wool insulation quilt + tinfoil, 14kg/m³ |
Auxiliary Material Color | color | Electrostatic spraying of outdoor special paint, baking varnish process, no discoloration for 5 years |
Auxiliary material Bolt | bolt | Inner hexagon (galvanized) |
downspout downspout | Downspouts | 50 downspout |
ceiling tile | Ceiling tile | 0.3 thick, 831 color steel integrated ceiling board, film-coated |
Floor Concrete pressure plate | cement pressure plate | 18mm thick, 1175*2820mm |
Floor Decoration Plastic Floor | Plastic flooring | 1.6mm, wear-resistant plastic floor leather |
door steel door | steel door | 970*1970mm 0.4mm (1150 type wallboard) |
Window Plastic steel anti-theft window | Plastic steel anti-theft window | 1130*1130mm double glass 0.3mm (1150 type wall panel) |
Auxiliary materials | Auxiliary material | screw, sealant |
Electric Advanced Electric Distribution | Advanced distribution | Industrial socket box + industrial socket 16A (1 set), distribution box J-8 (1), leakage protection (16A) (1), circuit breaker (2P32A) (1), circuit breaker (2P10A) ordinary socket 16A ( 3), air conditioner socket 32A (1), switch 1, long lamp 2 |
Wallboard 0.3mm on both sides (Type 950) | Double-sided 0.3mm (Type 950) | 50*950mm double-sided 0.3mm 50kg/m³ rock wool board, orange peel outside and flat inside |
This apartment is made up of three flat-packed container rooms, with custom-made tempered glass sliding windows. The three houses are connected and cover an area of about 44㎡.
The roof insulation layer is made of glass wool and tin foil paper insulation layer, which is integrated into the roof of the house before leaving the factory. It adopts gutter type internal drainage and integrates hidden downpipes.
The insulation layer is added at the bottom for free, and the insulation layer is made of glass wool and tin foil paper. It is integrated into the bottom of the floor of the house before leaving the factory. The upper and lower water pipes and wires are hidden in the integrated house structure.
After opening the flat container house, move the roof away from the side, take out the structure integrated in the packing box, and lay it out reasonably for installation.
Connect the columns with the upper and lower frames with bolts, measure the diagonals of the four facades, and measure the level with a level to ensure that there is no gap in the next step of wall panel installation.
Install hidden downpipes, arrange wall panels and doors and windows in order according to the requirements of doors and windows, and ensure that the wall panels are tightly spliced without gaps during installation. This step determines the waterproofing of the house.
Finally, install indoor and outdoor accessories, lay indoor electrical lines, install ceiling panels, install lights and switch sockets, and lay waterproof glue on the indoor and outdoor connections.
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.